Parks + Open Space
The parks and recreation element of a general plan represents an important step in the City’s efforts to enhance the public’s ability to enjoy the natural beauty and extensive recreational opportunities in the community.
SUMMARY OF THE CURRENT PLAN: Parks + Open Space
- Fruit Heights has 16.6 acres of City-owned park land in four parks:
- Nicholls Park (12 acres, community park)
- Harvey Park (4 acres, neighborhood park)
- Creekview Park and Ellison Farms Park (0.3 acres each, local parks)
- The City provides 2.7 acres of park land per 1,000 residents (2020 population of 6,101). That is at the low end of the Wasatch Front communities compared, which range from 2.8 to 8.0.
- Residents are generally satisfied with parks. They prefer improving existing parks over expanding the system, and want more shade, furnishings, and courts such as pickleball.
- Most neighborhoods are a short drive from a park, but the northeastern part of the city lacks parks within walking distance.
- The City has no tennis, pickleball, or sand volleyball courts, only one basketball court, and only one multipurpose field. Baseball fields, playgrounds, pavilions, and restrooms are adequate.
- Bringing existing parks up to standard requires 2 pickleball courts, 2 tennis courts, 2 multipurpose fields, 1 volleyball court, 1 basketball court, and 2 walking paths. The estimated cost is about $650,000.
- To keep the current level of service, the plan calls for 3.7 more acres by 2030 (population 7,500) and additional acreage by 2050 (population 9,000). The plan’s 2050 figure contains a math error and is being corrected.
- The Bonneville Shoreline and Bair Creek trails are only partially built. Trailheads exist at the mouth of Bair Canyon, Fruit Loops Mountain Bike Park, and Nicholls Park.
- Residents want stronger trail connections to parks and the foothills, plus sidewalks in neighborhoods and along key corridors.
- The proposed trail network includes about 6 miles of paved trail, 1 mile of unpaved trail, and 5 enhanced crossings, estimated at $1.73 million.
- The foothills and Bair Creek are central to community identity. Open space has no set standard and is acquired as opportunities arise, with priority on natural drainages and agricultural land.
CURRENT PLAN GOAL SUMMARY: PARKS + OPEN SPACE
1. Assure that residents have adequate access to parks
2. Maintain a high standard of park maintenance
3. Increase the amount and variety of natural open space
4. Implement the recommended trail facilities
5. Promote water conservation and urban forestry in parks
6. Preserve and enhance historic open spaces and landmarks